Aksu HES (Hydroelectric Power Plant) project, which is developed by Sur Enerji and its subsidiary companies, is situated on Aksu Stream in Sincik district of Adıyaman province. Energy Market Regulatory Authority granted a production license to the project in order to perform production activity for 49 years starting from May 4, 2011.
The construction of Aksu HES project started in 2012. The project was completed in 2014 and put into operation. There is 1 Pelton type turbine with a nominal output of 5.77 MW in Aksu HES. The annual production of Aksu HES is 21.000 MWh.
LOCATION: , Adıyaman
PROJECT TYPE: Energy