Elmalı RES (Wind Power Plant) project, which is developed by Sur Enerji and its subsidiary companies, is located in Dedeler village situated in Gülnar district of Mersin province. Energy Market Regulatory Authority granted a production license to the project in order to perform production activity for 49 years starting from July 6, 2011 in order to make production.
The construction of Elmalı RES project started in 2016. The project was completed in 2017 and put into operation. There are 3 Vestas V112 wind turbines with a nominal output of 3.0 MW in Elmalı RES. The annual production of Elmalı RES is 28.500 MWh.