Kurtini RES (Wind Power Plant) project, which is developed by Sur Enerji and its subsidiary companies, is located in Kayrak village situated in Gülnar district of Mersin province. Energy Market Regulatory Authority granted a production license to the project in order to perform production activity for 49 years starting from October 3, 2012.
The construction of Kurtini RES project started in 2017. The project was completed in 2018 and put into operation. There are 4 Nordex N117 type wind turbines with a nominal output of 3.5 MW in Kurtini RES. The annual production of Kurtini RES is 37.500 MWh.
LOCATION: , Mersin
PROJECT TYPE: Energy
Burhaniye St. Abdullahağa Ave. No:21 / 34676 Altunizade Üsküdar/Istanbul
(216) 422 65 14