Yakacık Regulator and HES (HPP) project, which is developed by Sur Enerji and its subsidiary companies, is situated on the Yakacık Streamlet in Payas district of Hatay province. Yakacık Regulator and HES project consists of a regulator, tunnel, load pool, penstock pipe, and power plant building. In Yakacık Regulator and HES project, 2 Pelton type turbines with a nominal output of 5.705 MW (a total of 11.41 MW) are planned to be installed and the annual production will be 30.000 MWh.
LOCATION: , Hatay
PROJECT TYPE: Energy
Burhaniye St. Abdullahağa Ave. No:21 / 34676 Altunizade Üsküdar/Istanbul
(216) 422 65 14